project management team importance

The Project Management Team in any Construction site is responsible for Planning ,Executing & Monitoring the project as per the project schedule and to ensure it is completed as per the agreed schedule.

Project Management Team mostly consist of Project Manager , Project Control Manager , Project Engineers etc.

One important function of Project Management team is to attend job progress meetings with all subcontracts in order to monitor progress of each discipline in the project , Project Management team also has the responsibility to attend meetings with Client in order to give information about actual progress attained against project schedule & milestone.

warehouse

Warehouse department is responsible to store all materials required for the project e.g. piping , equipment's , steel structures , piping accessories , bolts & nuts , instruments , electrical devices in a safe condition.

Warehouse department also ensures that all material received from respective suppliers is not damaged & is in a good condition.

Another important function of warehouse department is the ensure preservation of materials stored in warehouse.

progress reports

List of Progress Reports are listed below

1) Level 1 Base line Schedule
2) Level 2 Schedule
3) Level 3 Schedule
4) Level 4 Schedule
5) S Curve ( Plan Vs Actual ) report
6) Look a head Schedules
7) Manpower report
8) Equipment report


commissioning activities

List of Commissioning Activities are as follows :
  • Mechanical Run of Rotating Equipment's e.g. Pump , Compressor , Blower etc.
  • Instrument Interlock Checking.
  • Piping System Leak testing.
  • Static Equipment's Leak testing.

procurement department importance

Procurement department ensures the purchase and timely availability of different materials e.g. Equipment's , Steel Structures , Piping , Instruments etc. from different suppliers or vendors on site in order to start construction activities as per schedule.

Procurement department is responsible for preparation of quotations & issuance of purchase orders etc.

quality control and quality assurance importance in construction

Quality Department plays a very important role in ensuring that all construction activities are carried out as per the approved project specifications & international codes & standards.

Some Important roles of Quality department are listed below

1)Verify & approve ITP Inspection & test Plan , Method Statements , Quality Plan etc.
2)Prepare & Approve Welding Procedure Specification etc.
3) Prepare & keep record of Inspection Certificates.

piping installation includes

List of some Activities carried out by Piping department in the field of Construction are listed below

Fabrication & Installation of Piping Spools
Fit Up & Alignment Inspections
Perform Internal Cleaning of Piping
Pipe Line Testing

isometric drawings

Isometric drawings are used for the fabrication of piping spools & also for the installation of piping works in the field of construction.

Isometric drawings for piping spools provide details about description of pipe material & details of fittings e.g. tee , elbow etc. used in the fabrication of piping spool piece

sand blasting equipments

List of Equipment's commonly used for Sand Blasting activities are listed below

  • Compressors
  • Blasting Pots
  • After Coolers
  • High Pressure Washers

paint techniques in construction

List of Common Activities carried out by Painting department are listed below


1) Painting of Piping Spools & supports etc.
2) Painting of Structural Supports / Handrails etc.


Common Painting sequence includes Surface Preparation , Selection of Paint material , checking environmental parameters and then first Primary Coat , followed by Intermediate Coat & final Finish Coat.

scaffoldings

Scaffolding Department is responsible for installation of Scaffolding of different types e.g. suspended scaffolding , cantilever scaffolding , tower scaffolding , mobile scaffolding etc.

mechanical maintenance tools

List of tools commonly used by Mechanical Technicians to perform maintenance activities are listed below

1) Spanner ( different sizes )
2) Pipe Wrench
3) Vernier Caliper
4) Screw Gauge
5) Allen Key Set
6) Brass Hammer
7) Bearing Removal Kit
8) Dial Indicators
9) Measuring Tape
10) Depth Gauge
11) Pitch Gauge
12) Feeler Gauge Set
13) Torque Wrench Set
14) Screw Driver Set

architectural drafting tools

Below is a list of few tools used in architectural drafting
  • Draftsman scale
  • Protractor
  • Set square
  • Compass
  • divider tool
  • Pencil Set
  • drafting templates
  • T-square Ruler

electrician tools

Below is a list of few tools used by Electrical Technician.
  • Plier Set
  • Wire Stripper
  • Screw driver Set
  • Multimeter
  • Allen key set
  • Electrical Tape
  • Electrical testing pen
  • Adjustable wrench
  • Measuring tape

machinist tools

Below is a list of few tools used by Machinist.
  • Micrometer
  • Vernier Caliper
  • Depth Gauge
  • Outside Calipers
  • Inside Calipers
  • Machinist Scraper Set
  • Dial Indicators
  • Thread Gauge
  • Punch Set tools
  • Steel Rule
  • Combination Square Set

machinery maintenance tools

List of Tools generally required to carry out Overhauling of Equipments e.g. Pumps , Compressors , Turbines , Engines etc. are listed below
  • Spanner Set ( different sizes )
  • Vernier Caliper , Screw Gauge , Feeler Gauge set etc. to measure & record clearances.
  • Allen Key Set
  • Dial Indicator with Magnetic stand
  • Torque Wrench Set
  • Special Tools supplied by Vendor of Equipments
  • Bearing Removal Kit
  • Screw Driver Set
  • Measuring Tape
  • Depth Gauge
  • Pitch Gauge
  • Pipe Wrench
  • Ratchet Set
  • Adjustable Spanner

engineering structures in construction

List of Common Activities carried out by Steel Structure Department in any Construction site are listed below

1) Erection of Steel Structures
2) Erection of Beams
3) Erection of Hand Rails
4) Erection of Stairs and Ladders
5)Installation of Gratings

engineering studies tips

As an Engineering student one should give full attention to their studies and learn thoroughly each & every subject in their curriculum, keeping in mind that whatever you learn in University will definitely help you to succeed in your professional career. Paying special attention to lab works , assignments , presentations , research work etc. will definitely develop your professional & presentation skills.

Students during their vacations should attend Internships in any professional organization , company or Industry related to their discipline of Study it will give them an opportunity to enhance their technical knowledge.

Now a days , there is lot of competition in the job market and every company wants to hire the brightest & most brilliant student , one should keep in mind that by learning & attending specific professional training courses related to your discipline will definitely give you an advantage when you will go out to search for a job related to your discipline.

how to write assignment

Here are a few points you should be consider when you are preparing an Assignment for your coursework.

  • Include a "dedication page" e.g. you can write a page with title "Dedication" to your teachers or parents who help you in preparation of your assignment.
  • Write a "Preface Page" about your assignment.
  • Include an "Index Page" this will help the reader in searching for specific topic & can go directly to that page.
  • Your Content should be categorized in Chapters and you can include Headings for every new topic.
  • All pictures , drawings & tables should be clearly visible and labeled.


          • Include a "Reference Page".

          sample minutes of meeting

          Minutes of Meeting is an properly formatted written document after completion of any meeting between concerned stakeholders.

          Below are some of the most important points that should be considered when writing minutes of meeting.

          1) Details about Date , Time , Venue & Subject of the meeting to be mentioned.

          2) Minutes of Meeting must include list of all Attendees present in the meeting , details to be mentioned about attendees includes name of the person & his company name.

          3)Details to whom the minutes of meeting document to be distributed to be included.

          4)Signatures of concerned in charges from both parties to be included in the minutes of meeting.

          5)All meeting discussion points should be included in the document , headings for each department & description of points discussed related to that particular department should be included also mention name of company who is going to perform that particular point & its completion due date for each point in the document.

          6)Attendance list signed by all participants should be attached along with the minutes of meeting document.

          team working skills

          Importance of Team Working skills in the field of Construction

          Construction activities e.g. construction of road & paving works , construction of foundation , pipe line installation works etc.  involve a large number of staff members & workers e.g. engineers , supervisors , foreman , workers etc. working for their respective departments in the field. Team work plays an important role in ensuring that all activities at site are executed in a safe & efficient manner. Let us review some of the important aspects of team work.

          Firstly , It is the responsibility of each individual working in a team to respect & look after their fellow team members in ensuring that he is respecting & following all the necessary safety precautions & guidelines for performing the tasks.

          Secondly, team members should support their team members if they need some help.

          Lastly , Team Building training's should be given to each individual working on the project in order to ensure that all construction activities at site are executed in a safe & efficient manner.

          Importance of foreign language learning

          Importance of learning foreign language

          There is a lot of competition in today's job market , In addition to be technically sound in your profession if you know any additional language that will definitely increase your chances of finding a job.

          So which language do you learn ? Although there are many factors that you should consider before you put your precious time , effort & money in learning new language one should consider which language is frequently spoken by people where he is going to work e.g. If an Indian national wants to work in China , he should know that his day to day interaction with people will be in Chinese so learning Chinese language will definitely increase his chances of finding a job in China.

          There are a number of Language Institutions that teach different languages in every country , also there are internet sites that offer online courses for learning additional languages.

          What PPE Stands for

          PPE Stands for Personal Protective Equipment's.

          List of Common Personal Protective Equipment's used on every construction site are listed below

          • Safety Shoes
          • Safety Helmet
          • Safety Glass
          • Safety Coveralls
          • Safety Masks
          • Safety Gloves
          • Safety Harness

          Safety reports and permit to work

          List of Common Safety Reports and Permit to work are listed below

          1) Task Risk Assessment
          2) Evacuation Plan
          3) Job Safety Analysis
          4) Hot Work Permit
          5) Cold Work Permit
          6) Confined Space Work Permit
          7) Excavation Work Permit
          8) Work at Height Permit

          tool box talk in construction projects

          In any construction site before start of any work activity concerned supervisor or team leader gives a talk know as "Tool Box Talk" to all concerned team members & workers who are responsible to perform that activity.

          The took box talk focuses on various aspects of how any work activity can performed  in a SAFE manner & what steps are required to be followed in order to ensure that all safety precautions are in place & activity is executed according to the guidelines set by site HSE ( Health , Safety & Environment ) procedures and company rules & regulations.

          Tool Box Talk also give a chance to workers to communicate directly to their team leaders or supervisors for matters relating to Job safety & what steps & procedures they can follow in order to perform job in a safe manner.
          Tool Box Talk plays an important role in ensuring that all activities at site are carried out in a safe manner.

          mechanical technician as a career

          Basic Requirements required to become a Mechanical Technician is as follows :

          1) Education Level : diploma

          2) Experience in Installation , Repair & testing of Mechanical Equipment's e.g. Pumps , Compressor , turbines , engines etc.

          3) Good Knowledge of Computer Software Programs e.g. Office etc.

          3) Good Communications skills.

          4) Good Knowledge of Health , Safety & Environment.

          Where Mechanical Technician Works

          Mechanical Technician works mostly in Oil / Gas & Petrochemical Plants e.g.
          Fertilizer Plant , Oil Refinery , LNG Plants etc.

          Mechanical Technician from a Career Point of View.

          As a Profession Mechanical Technician is very rewarding , It offers you job security since most of the plants require mechanical technician on a full time basis & with experience & knowledge you can earn a very good salary.

          how to get a job

          Firstly thanks to the internet you can find a lot of companies related to any profession or field where you can simply upload your CV directly on their respective websites this is one of the easiest & most reliable method.

          Secondly , now a days there are a lot of Job Sites on the internet where you have the option of uploading your CV & it gives you the opportunity to explore a number of jobs.

          Lastly , you can also take advice from several job consultant websites available on internet that can give you valuable information regarding job opportunities related to your discipline.

          construction work main activities

          List of some construction work activities are listed below

          1) Site Preparation & Earth Works
          2) Construction of Foundation , wall , Column etc.
          3) Steel Structure Installation
          4) Road works.
          4) Rigging / Installation of Equipment's.

          mechanical engineers work locations

          There are a number of Industries that employ Mechanical Engineers Below is a list of few Industries where Mechanical Engineers work
          • Refineries
          • Power Plants
          • Petrochemical Plants
          • Cement Plants
          • Automobile Industry
          • Fertilizer Plants

          lifting and rigging equipments

          List of few Lifting and Rigging Equipment's commonly used on construction sites are listed below

          Crane
          Forklift
          Manlift
          Chain Block
          Wire Rope & Slings
          Shackle

          mechanical works activities related to construction industry


          Mechanical works activities in construction includes the following  
          • Installation of Rotary Equipment's e.g. Pumps , Compressors etc.
          • Installation of Stationary Equipment's e.g. Columns , Vessels , Drums etc.
          • Installation of Package Equipment's
          • Installation of Static Equipment Internals
          • Installation of Small Bore & Large Bore Piping
          • Civil works.
          • Insulation works
          • Painting works
          • Structural works

          millwright job description

          Millwright in any construction site or project is responsible to carry out installation of machinery components or equipment's e.g. pumps etc.

          Below is a list of few activities carried out by Millwrights in any construction site or project.
          • Installation of Machinery on foundation that includes shimming , Placement of machinery on foundation with help of rigging crew & carry out leveling of machinery on foundation e.g. for a pump coupled with motor a millwright needs to check & if necessary correct DBSE ( distance b/w shaft ends ) as per drawing , check & if necessary correct soft foot as per specifications , Carry out shaft alignment etc.
          • Millwrights also carry out onsite assembly work for rotary equipment's e.g. installation of compressor pistons etc.
          List of Tools commonly used by Millwrights are as follows :
          • Dial Indicators with Magnetic Stand
          • Vernier Caliper
          • Precision Level
          • Spirit Level
          • Feeler Gauge Set
          • Torque Wrench Set
          • Measuring Tape
          • Depth Gauge
          • Pitch Gauge
          • Screw Driver Set
          • Spanner ( different sizes )
          • Allen Key Set
          • Screw Gauge

          pipe fitter job description


          Pipe fitter in any construction site are responsible for the fabrication , fit up & installation of Piping spools.

          Pipe fitters should should have sound understanding of Pipe fittings e.g. Elbow , Tee , Reducer etc.

          Also , Pipe fitters should know what are the different types of Pipe Flanges used in Piping work , how to read & interpret piping isometric drawings & P&ID & what are the different pipe sizes , pipe schedules , & pipe pressure ratings etc.

          Below is a list of few tools used by pipe fitters in any construction site or project.

          Level
          Try Square
          Measuring Tape
          Taper Gauge
          Weld Gauge
          Pipe wrench

          types of pump


          There are mainly two types of Pumps which are listed below.

          1) Centrifugal Pumps
          2) Positive Displacement Pumps

          types of welding

          Types of Welding are listed below

          1) Shield Metal Arc Welding ( SMAW )
          2) Gas Tungsten Arc Welding ( GTAW )
          3) Submerged Arc Welding ( SAW )
          4) Laser Welding

          construction project manager job description


          Construction Manager in any project site is responsible for Overall Management of all construction activities on site that includes managing departments like Civil, Mechanical, Electrical, Instrumentation etc.

          As a focal point construction manager has to attend all meetings between various stake holders & give proper feedback.

          As a Profession Construction Manager Position is very rewarding in terms of Salary & benefits.

          rotary equipment types

          Types of Rotary Equipment's are listed below :

          • Pumps
          • Compressors
          • Blowers
          • Fans
          • Turbines
          • Generators
          • Engines

          static equipment types

          Types of Static Equipment's are listed below:

          • Columns
          • Vessels
          • Drums
          • Filters
          • Heat Exchangers

          plant maintenance description

          Plant maintenance is a very vast field there are a number of activities related to plant maintenance few of them are listed below.

          1) Maintenance of Rotary equipment's e.g. pumps , compressors, turbines etc.
          2) Maintenance of Electrical Equipment's and devices.
          3) Maintenance of Instruments e.g. Pressure transmitter etc.
          4) Preservation of Equipment's.
          5) Overhauling of Equipment's.
          6) Preventive Maintenance of Equipment's e.g. pump oil change , greasing of bearing housing , line cleaning etc.
          7) Maintenance of Static Equipment's.
          8) Preparation of Preventive Maintenance Plan.
          9) Reviewing Spare Part Availability.
          10) Preparation of log of all repair activities performed.

          Pump alignment procedure


          Pump alignment is performed by using any of the following methods

          1) Rim & Face Method
          2) Reverse Dial Indicator Method
          3) Laser Alignment Method

          Common Tools used to perform alignment of pump includes the following

          1) Dial Indicators
          2) Outside Micrometer
          3) Torque Wrench
          4) Measuring Tape
          5) Vernier Caliper
          6) Thickness Gauge

          mechanical engineering technician interview questions tips

          It is very important to prepare thoroughly before you go for the interview in order to be successful below are a few tips.


          1) Learn about the maintenance , overhauling & operation procedure for different types of Rotary Equipments e.g. Centrifugal Pumps , Reciprocating Pumps , Blowers , Turbines , Engines etc.

          2)Learn about different types of Mechanical Seal & their installation procedure.

          3)Learn about Mechanical Seal Plans.

          4)Learn about different types of bearings.

          5)Prepare your self to answer questions about different types of Shaft Alignment Methods e.g. rim & face method , reverse alignment method & laser shaft alignment method.

          6)Learn about the importance of Safe work Practices & Health , Safety & Environment.

          7)Learn about different types of Gears & their functions.

          8)Learn about different types of couplings & their installation procedures.

          9)Prepare to read equipment cross sectional drawings.

          10)Learn about Static Equipment's e.g. Columns , Heat Exchanger , Vessels etc.

          11) Be honest about your experience & knowledge.

          Type of insulation


          Common Insulation types are listed below

          1) Hot Insulation
          2) Cold Insulation
          3) Acoustic Insulation

          Monday, 7 December 2015

          measuring instruments

          Measuring instruments includes
          • Hygrometer
          • Thermometer
          • Barometer
          • Anemometer

          instrument technician


          Instrument technician performs the following main tasks

          1) Instrument Cable installation.
          2) Instrument Tubing Installation.
          3) Installation of Instrument Panels.
          4) Installation of Instruments e.g. Pressure Gauge , Pressure Transmitter , Level Gauges , Control Valves etc.

          instrumentation and control


          Devices used for Instrumentation and control includes
          • Pressure Gauges
          • Pressure Transmitters
          • Level Gauges
          • Control Valves
          • Thermocouples

          resume writing tips

          A properly formatted resume should include the following main points.


          1)Personal Information

          Mention about Personal Information e.g. email , phone no. address etc.

          2)Objective

          Highlight about your skills & experience

          3)Experiences

          Mention about your Experiences , mention details like current title , position , duration , job description etc.

          4)Qualification

          Mention about your Qualification e.g. bachelor degree , diploma etc.

          5)Training's & Certifications

          Include details of Training & Certifications you have obtained.

          6)Technical Skills
          Mention about Technical Skills you know e.g. computer skills.

          7)Awards & Achievements

          Mention about awards & achievements you have achieved.

          8)References

          Include details about your References.

          maintenance engineer resume

          A maintenance engineer resume should focus on following points.
          • Mention about your knowledge & experience of using International Codes & Standards for Equipment's e.g. Pumps, Compressors, Heat Exchange's etc.
          • Give details about the Equipment's on which you have worked & possess good trouble shooting knowledge.
          • Give details about your knowledge & experience  of using computerized maintenance management system & software’s you have practical experience.
          • Give details about your knowledge in creating & reviewing of Maintenance Procedures, Preventive Maintenance Plans, Equipment Root Cause Failure Reports etc.
          • Give details about your Qualification & experiences.
          • Give details about your achievements.
          • Give details about the training's & certifications you have done.

          estimation definition

          Estimation is the process of calculating the overall cost of the project by using various methods,tools and techniques.

          estimating quantities

          List of estimating quantities for various items is as follows

          1) Piping fabrication Progress is calculated in terms of ID Inch Dia.

          2) Equipments installations is calculated in terms of weight
          e.g. ( metric tonnes ) units.

          3) Steet Structure is calculated in terms of weight e.g.             ( metric tonnes ) units.

          4) Concrete is calculated in terms of e.g. meter cube m3 units.

          electrical department functions

          List of Common Electrical Works Activities in Construction are as follows :

          1) Electrical Cable Laying and termination.
          2) Installation of Electrical Panels.
          3) Installation of Transformers.
          4) Installation of Lighting systems.

          electrical devices list

          List of some Electrical devices is as follows : 

          • Transformers
          • Motors
          • Cables
          • Batteries
          • Busbar
          • Switchgear
          • Capacitors
          • Switches & Sockets

          design department activities

          Design Department is responsible to prepare & approve all engineering drawings & documents required for the project
          Each discipline has their own design team e.g. Equipment design , Piping design , Civil design , Electrical Design , Instrument design etc.

          commissioning and start up activities

          List of Common Commissioning and Startup Activities are as follows 


          • Mechanical Run of Rotating Equipment e.g. Pump , Compressor , Blower etc.
          • Instrument Interlock Checking.
          • Piping System Leak testing.
          • Static Equipment's Leak testing.

          Civil works equipments

          List of Equipment's commonly used for Civil Works Activities is as follows


          • Loader
          • Excavator
          • Dozer
          • Tanker
          • Rollers

          surveying instruments

          List of Instruments used for Surveying Activities is as follows

          • Theodolite
          • Total Station
          • Auto Level
          • Measuring tape

          Sunday, 6 December 2015

          Types of civil works


          Types of Civil works in Construction includes.

          • Surveying Activities.
          • Site Preparation & Earth works e.g. Excavation, Backfilling, Compaction etc.
          • Construction of Foundation, Column & Wall works.
          • Grouting Works.
          • Road and Paving Works